When GIG 19 started its work in 1984, the following terms of reference were established:
- Scheme for the application of available diagnostic methods and their interpretation for the assessment of the performance of concrete structures and their remaining structural life.
- Procedures and criteria for the above-mentioned assessments; this second term of reference was to be developed in more detail in collaboration with Commission I (Reliability) and Commission II (Redistribution).