N°205. 1991. CEB-FIP Model Code 90 - Final Draft - Vol. 3
The content is not extensive enough to be used as a contract document More information for carrying out construction (including safety on site) should be taken from manuals such as the FIP Guide to Good Practice -Basic reinforced concrete and prestressed concrete construction, FIP London, 1978.
Durability and service life aspects are treated in section 8.1.
In ordinary construction where standard practice is ensured, these charts may not be needed.
It should be noted that the activities listed is an example; in some countries other definitions may be specified.
These activities may be assumed by different persons (in case of large or complicated structures); some of them may be assumed by the same person depending on the size of the work and accepted standard practice.